The Working Principle of Bolted type Storage Silo
Release Date: 2022-07-27 Views:
The Working Principle of Bolted type Storage Silo

When the bolted cement silo works, it must be erected by a special crane, and then placed on the precast concrete foundation. Then check the verticality of the cement tank to the horizontal plane after standing up and weld its bottom to the embedded parts of the foundation firmly.
After the storage silo is erected, the bulk cement truck will transport the cement to the construction site, and then connect the conveying pipeline of the truck with the feed pipeline of the bolted cement tank. Then the cement can be transported into the cement tank by the air pressure from air compressor in the truck..
During the process of transporting cement into the storage bin, the operator should press the button of the duster vibration motor uninterruptedly to shake off the cement attached to the bag of the dust collector to prevent the bag from jamming and a burst occurring.
Once the cloth bag is blocked and the pressure inside the cement silo exceeds the safety pressure of the top pressure safety valve. The operators should open the pressure relief valve to release the pressure in the silo to prevent the explosion accident.
The silo body is equipped with level indicator, and operators can observe the full or lack of material through the high and low material levels.


When the cement is need unloading, open the manual unloading valve at the bottom of the cone firstly, and then transport the cement out through the cement screw conveyor. In the process of discharging, if the phenomenon of arching occurs, press the button of the solenoid valve of the air blowing device in time to blow the air. Eliminate the phenomenon of caking and feed to ensure the smooth supply of cement.
When the cement conveying device fails, close the manual unloading butterfly valve at the bottom of the cone to prevent cement overflow and waste.