1. Reasonable design, stable structures and reliable work performance;
2. Adopt 360° full rotary placing boom, the rotation is flexible;
3. Improve the placing precision and reduce the hose shaking. Apply to the elevator shaft and floor can open the hole of high-rise building construction.